LUMORA · Interior doors · price guide

LUMORA Interior door prices: how to compare a complete quotation

The price of interior doors is determined by the confirmed configuration, dimensions, finish, hardware, delivery and installation scope.

Price without traps

The lowest number often describes the smallest scope

Two quotations can look similar while including different products, accessories and services.

A comparable price must be tied to a confirmed configuration, market, VAT treatment, delivery area and validity date.

Numerical price-list statusPending confirmed configurations, VAT treatment, delivery area and validity date.

Configuration

Six groups that determine the final price

01

Dimensions and configuration

This item must be specified because a different choice changes the product, labour or delivery scope.

02

Material and finish

This item must be specified because a different choice changes the product, labour or delivery scope.

03

Glazing and components

This item must be specified because a different choice changes the product, labour or delivery scope.

04

Hardware and function

This item must be specified because a different choice changes the product, labour or delivery scope.

05

Quantity and logistics

This item must be specified because a different choice changes the product, labour or delivery scope.

06

Measurement and installation

This item must be specified because a different choice changes the product, labour or delivery scope.

Comparable quotation

What a comparable quotation must define

Each row must be included, optional, a customer obligation or not applicable.

ItemWhat the quotation must defineWhy it changes the price
ProductState the exact selection, quantity and included scope.A different specification changes cost, performance or responsibility.
DimensionsState the exact selection, quantity and included scope.A different specification changes cost, performance or responsibility.
MaterialState the exact selection, quantity and included scope.A different specification changes cost, performance or responsibility.
FinishState the exact selection, quantity and included scope.A different specification changes cost, performance or responsibility.
HardwareState the exact selection, quantity and included scope.A different specification changes cost, performance or responsibility.
MeasurementState the exact selection, quantity and included scope.A different specification changes cost, performance or responsibility.
TransportState the exact selection, quantity and included scope.A different specification changes cost, performance or responsibility.
InstallationState the exact selection, quantity and included scope.A different specification changes cost, performance or responsibility.
Commercial termsState the exact selection, quantity and included scope.A different specification changes cost, performance or responsibility.

Three scope levels

Three scopes that must not share the same name

01

Product only

The quotation must explicitly list the product and every included service.

Check exclusions, customer obligations and finishing work before comparing totals.
02

Product and delivery

The quotation must explicitly list the product and every included service.

Check exclusions, customer obligations and finishing work before comparing totals.
03

Delivered and installed

The quotation must explicitly list the product and every included service.

Check exclusions, customer obligations and finishing work before comparing totals.

Enquiry data

Five inputs for a responsible estimate

  1. 01

    Opening schedule with approximate dimensions and quantities.

  2. 02

    Selected system, model, colour, finish and functional requirements.

  3. 03

    New build or replacement, with photographs of the current condition.

  4. 04

    Site location, floor, access and requested delivery period.

  5. 05

    Required scope of measurement, removal, transport, installation and finishing.

Number after confirmation

A number needs a configuration owner and a date

Every published figure should identify the configuration and state whether accessories, measurement, transport, installation and VAT are included.

Until commercial figures are approved, a transparent methodology is more useful than an attractive number that cannot be reproduced in a real order.

Common questions

Frequently asked price questions

01

How much does it cost?

There is no responsible single price without dimensions, configuration, quantity, location and scope.

02

Is a price per square metre useful?

Only as a rough reference for an exactly defined product; area alone does not describe components or labour.

03

What changes the price most?

Dimensions, configuration, material, finish, hardware, accessories, logistics and installation scope.

04

Is installation included?

Only when explicitly stated together with measurement, transport, removal and finishing work.

05

How should two quotations be compared?

Compare the same specification, services, VAT treatment, warranty, lead time and validity date.

Početak saradnje

Request the price of a defined complete scope

Send dimensions, quantity, selected model or system, location and required services. The quotation should clearly show what is included.