
How to prepare a prefabricated house enquiry: 7 inputs for a serious quotation
The seven inputs on location, design, area, wall system, scope, budget and schedule needed for a useful prefabricated house quotation.
Read article→Advice and guides
A structured knowledge hub for house selection, price scope, permits, low-energy design, construction sequence, turnkey definitions and the coordinated LUMORA programme.
01 / Latest from the BLOG
03 / Explore by topic

Compare structure, wall build-up, energy targets, design responsibility, transport, assembly, interfaces, documentation, warranty and exclusions before comparing the final price.
Open guide→
Energy performance comes from the complete building: orientation, compact geometry, insulation continuity, airtightness, thermal bridges, windows, shading, ventilation, systems and verified execution.
Open guide→
Planning status, surveys, access, utilities, geotechnical conditions, local approvals and foundation responsibilities are checked before production or a binding programme is confirmed.
Open guide→
The reliable sequence runs from site data and design through approvals, engineering, factory production, foundations, logistics, assembly, services, finishes, inspection and handover.
Open guide→
Turnkey means only what the signed offer includes. Site work, foundations, services, interior finishes, external works, permits and local obligations must be listed as included, excluded or client-provided.
Open guide→
Wall build-ups are defined through structural, thermal, moisture, fire and acoustic requirements. Final layers and values belong to the approved project specification.
Open guide→
Off-site production supports efficient residential, commercial, educational and public projects with material systems selected for each building.
Open guide→
A coordinated programme of timber, timber-aluminium, PVC and aluminium windows, entrance and interior doors, sliding systems and stairs.
Open guide→
A coordinated programme of timber, timber-aluminium, PVC and aluminium windows, entrance and interior doors, sliding systems and stairs.
Open guide→
A coordinated programme of timber, timber-aluminium, PVC and aluminium windows, entrance and interior doors, sliding systems and stairs.
Open guide→04 / Topic clusters