Prefabricated wall system
Wall build-ups are defined through structural, thermal, moisture, fire and acoustic requirements. Final layers and values belong to the approved project specification.
SAVOX · Factory precision, verified for the actual site
The floor structure is designed as part of the complete load path and coordinated with spans, acoustics, fire requirements, services and finishes.
Technical answer
The floor structure is designed as part of the complete load path and coordinated with spans, acoustics, fire requirements, services and finishes.
The selected model is a design starting point. Final geometry, openings, structure and energy performance are confirmed through project documentation and local requirements.
The final build-up, dimensions and connections are confirmed by calculation and approved project documentation for the actual site and building.
Design inputs
Wall build-ups are defined through structural, thermal, moisture, fire and acoustic requirements. Final layers and values belong to the approved project specification.
The floor structure is designed as part of the complete load path and coordinated with spans, acoustics, fire requirements, services and finishes.
Claims are supported by applicable project documents, product declarations, certificates and test reports confirmed for the selected product and market.
The reliable sequence runs from site data and design through approvals, engineering, factory production, foundations, logistics, assembly, services, finishes, inspection and handover.
Planning status, surveys, access, utilities, geotechnical conditions, local approvals and foundation responsibilities are checked before production or a binding programme is confirmed.
A coordinated programme of timber, timber-aluminium, PVC and aluminium windows, entrance and interior doors, sliding systems and stairs.
One coordinated system
The reliable sequence runs from site data and design through approvals, engineering, factory production, foundations, logistics, assembly, services, finishes, inspection and handover.
Claims are supported by applicable project documents, product declarations, certificates and test reports confirmed for the selected product and market.
Wall build-ups are defined through structural, thermal, moisture, fire and acoustic requirements. Final layers and values belong to the approved project specification.
Planning status, surveys, access, utilities, geotechnical conditions, local approvals and foundation responsibilities are checked before production or a binding programme is confirmed.
Control points
Each point needs an owner, an approved drawing revision and evidence of verification.
Location, design, structural requirements, transport, assembly, services and finishes are checked for each project. Unconfirmed market-specific prices or obligations are never presented as facts.
The selected model is a design starting point. Final geometry, openings, structure and energy performance are confirmed through project documentation and local requirements.
Claims are supported by applicable project documents, product declarations, certificates and test reports confirmed for the selected product and market.
The reliable sequence runs from site data and design through approvals, engineering, factory production, foundations, logistics, assembly, services, finishes, inspection and handover.
Planning status, surveys, access, utilities, geotechnical conditions, local approvals and foundation responsibilities are checked before production or a binding programme is confirmed.
What the offer and design must separate
| Area | Design input | Confirmation before production |
|---|---|---|
| Prefabricated house construction process | The reliable sequence runs from site data and design through approvals, engineering, factory production, foundations, logistics, assembly, services, finishes, inspection and handover. | Location, design, structural requirements, transport, assembly, services and finishes are checked for each project. Unconfirmed market-specific prices or obligations are never presented as facts. |
| Quality and documentation | Claims are supported by applicable project documents, product declarations, certificates and test reports confirmed for the selected product and market. | The selected model is a design starting point. Final geometry, openings, structure and energy performance are confirmed through project documentation and local requirements. |
| Prefabricated wall system | Wall build-ups are defined through structural, thermal, moisture, fire and acoustic requirements. Final layers and values belong to the approved project specification. | Claims are supported by applicable project documents, product declarations, certificates and test reports confirmed for the selected product and market. |
| Permits and site preparation | Planning status, surveys, access, utilities, geotechnical conditions, local approvals and foundation responsibilities are checked before production or a binding programme is confirmed. | The reliable sequence runs from site data and design through approvals, engineering, factory production, foundations, logistics, assembly, services, finishes, inspection and handover. |
Common questions
The answers do not replace structural calculations or a locally approved design.
The reliable sequence runs from site data and design through approvals, engineering, factory production, foundations, logistics, assembly, services, finishes, inspection and handover.
Claims are supported by applicable project documents, product declarations, certificates and test reports confirmed for the selected product and market.
Wall build-ups are defined through structural, thermal, moisture, fire and acoustic requirements. Final layers and values belong to the approved project specification.
Planning status, surveys, access, utilities, geotechnical conditions, local approvals and foundation responsibilities are checked before production or a binding programme is confirmed.