Envelope · details · systems · demand

Low-energy prefabricated houses

Energy performance comes from the complete building: orientation, compact geometry, insulation continuity, airtightness, thermal bridges, windows, shading, ventilation, systems and verified execution.

Low-energy prefabricated houses · SAVOX Albus

How to read the visual

Low-energy performance must be supported by calculation

Energy performance comes from the complete building: orientation, compact geometry, insulation continuity, airtightness, thermal bridges, windows, shading, ventilation, systems and verified execution.

The selected model is a design starting point. Final geometry, openings, structure and energy performance are confirmed through project documentation and local requirements.

Specification

Seven parts of an energy-efficient home

01

Low-energy prefabricated houses

Energy performance comes from the complete building: orientation, compact geometry, insulation continuity, airtightness, thermal bridges, windows, shading, ventilation, systems and verified execution.

02

Prefabricated wall system

Wall build-ups are defined through structural, thermal, moisture, fire and acoustic requirements. Final layers and values belong to the approved project specification.

03

Roof structure

Roof geometry and structure are checked against architecture, local snow and wind loads, drainage, insulation, airtightness and the selected finish.

04

Floor structure

The floor structure is designed as part of the complete load path and coordinated with spans, acoustics, fire requirements, services and finishes.

05

LUMORA windows and doors

A coordinated programme of timber, timber-aluminium, PVC and aluminium windows, entrance and interior doors, sliding systems and stairs.

06

Prefabricated house construction process

The reliable sequence runs from site data and design through approvals, engineering, factory production, foundations, logistics, assembly, services, finishes, inspection and handover.

07

Quality and documentation

Claims are supported by applicable project documents, product declarations, certificates and test reports confirmed for the selected product and market.

Before the contract

What to request before a decision and proposal

  1. 01

    Location, design, structural requirements, transport, assembly, services and finishes are checked for each project. Unconfirmed market-specific prices or obligations are never presented as facts.

  2. 02

    The selected model is a design starting point. Final geometry, openings, structure and energy performance are confirmed through project documentation and local requirements.

  3. 03

    Wall build-ups are defined through structural, thermal, moisture, fire and acoustic requirements. Final layers and values belong to the approved project specification.

  4. 04

    A coordinated programme of timber, timber-aluminium, PVC and aluminium windows, entrance and interior doors, sliding systems and stairs.

  5. 05

    The reliable sequence runs from site data and design through approvals, engineering, factory production, foundations, logistics, assembly, services, finishes, inspection and handover.

  6. 06

    Claims are supported by applicable project documents, product declarations, certificates and test reports confirmed for the selected product and market.

Evidence before claims

One U-value is not the energy class of the whole house

Energy performance comes from the complete building: orientation, compact geometry, insulation continuity, airtightness, thermal bridges, windows, shading, ventilation, systems and verified execution.

Wall build-ups are defined through structural, thermal, moisture, fire and acoustic requirements. Final layers and values belong to the approved project specification.

Investor questions

Frequently asked questions about low-energy prefab homes

Energy performance belongs to the exact location and agreed configuration, not to a system name alone.

01Low-energy prefabricated houses?

Energy performance comes from the complete building: orientation, compact geometry, insulation continuity, airtightness, thermal bridges, windows, shading, ventilation, systems and verified execution.

02Prefabricated wall system?

Wall build-ups are defined through structural, thermal, moisture, fire and acoustic requirements. Final layers and values belong to the approved project specification.

03LUMORA windows and doors?

A coordinated programme of timber, timber-aluminium, PVC and aluminium windows, entrance and interior doors, sliding systems and stairs.

04Prefabricated house construction process?

The reliable sequence runs from site data and design through approvals, engineering, factory production, foundations, logistics, assembly, services, finishes, inspection and handover.

05Quality and documentation?

Claims are supported by applicable project documents, product declarations, certificates and test reports confirmed for the selected product and market.

Početak saradnje

Request an energy solution for your location

Send the location, model or plan, openings and desired scope. A serious response starts with calculation and a verifiable configuration.